The Great Manmade River or Great Man-made River is a network of pipes that supplies water from the Sahara Desert in Libya from a fossil aquifer. Some sources cite it as the largest engineering project ever undertaken. According to its website, it is the largest underground network of pipes in the world. It consists of more than 1300 wells, most more than 500 m deep, and supplies 6,500,000 m³ of freshwater per day to the cities of Tripoli, Benghazi, Sirt and elsewhere. Muammar al-Gaddafi has described it as the “eighth wonder of the world.”
The total cost of the project is projected at more than 25 billion US dollars. Libya claims to have completed the work to date without the financial support of major countries or loans from world banks. Since 1990, UNESCO has provided training to engineers and technicians involved with the project.
History
In 1953, efforts to find oil in southern Libya led to the discovery of huge quantities of fresh water underground. The GMRP was conceived in the late 1960s and work on the project began in 1984. The project’s construction was divided into five logically separate phases. The first phase required 85 million m³ of excavation and was inaugurated on August 28, 1991. The second phase (dubbed First water to Tripoli) was inaugurated on September 1, 1996.
The project is owned by the Great Man-made River Authority and funded by the Libyan government. Brown & Root and Price Brothers were responsible for the original design, and the primary contractor for the first phases was Dong Ah and present main contractor is Al Nahr Company Ltd.This company was registered in England and Wales as a foreign company FC017848 until July 31, 2003.
The fossil aquifer from which this water is being supplied is known as the Nubian Sandstone Aquifer System. It accumulated during the last ice age and is not currently being replenished.
A large, recently-settled lawsuit arose from the project, between the Libyan government and Brasoil, a subsidiary of the Brazilian national oil company, which was contracted to drill many of the wells in the early stages of the project. Many (hundreds) of the wells in the project collapsed or failed prematurely for unexplained reasons.
The Guinness World Records 2008 book has acknowledged this as the world’s largest irrigation project.
Timeline
- 3 October 1983: The General People’s Congress held an extraordinary session to draft the resolutions of the basic people’s Congresses, which decided to fund and execute the Great Man-Made River Project.
- 28 August 1984: Muammar al-Gaddafi lays the foundation stone in Sarir area for the commencement of the construction of the Great Man-Made River Project.
- 28 August 1986: Muammar al-Qaddafi inaugurated the Brega plant for the production of the Pre-stressed Concrete Cylinder pipes, which are considered the largest pipes made with pre-stressed steel wire. Sarir plant was also inaugurated on this date.
- 26 August 1989: Muammar al-Qaddafi lays the foundation stone for phase II of the Great Man-Made River Project.
Water Arrival
- 11 September 1989 Ajdabiya reservoir.
- 28 September 1989 Grand Omar Muktar reservoir.
- 4 September 1991 Al Gardabiya reservoir.
- 28 August 1996 First Water to Tripoli.
- 28 September 2007 First Water to Gharyan.
Incoming search terms:
- great man-made river
- Great Manmade River
- Great Man-made Structures
- Great Man made River Project
- Great Manmade River Project
- libya great river
- big pics of towers in the world
- great manmade river libya
- Great Man made river
- the great man made river


John F. Kennedy Center for the Performing Arts - Washington, D.C, United States
Taipei 101 - Taipei, Taiwan
Tunnel and Reservoir Plan - Chicago, USA